Beacon Grand Hotel — ERCES Installation
450 Powell Street, San Francisco
HetNet Wireless is soliciting bids from qualified ERCES / public safety DAS integrators for a complete Emergency Responder Communications Enhancement System at the Beacon Grand Hotel. Qualified integrators may request the full RFP package and design set below.
About the Property
Originally opened in 1928 as the Sir Francis Drake Hotel, the Beacon Grand is a 416-room historic landmark at the corner of Sutter and Powell, steps from Union Square and along San Francisco's iconic Powell Street cable car line. Renamed in 2022 following a major renovation, the 21-story property remains one of the most recognizable hotels in downtown San Francisco. This ERCES installation will deliver compliant in-building emergency responder radio coverage across the property's guest floors, public areas, and back-of-house spaces in support of SFFD Section 510 / Administrative Bulletin 3.04 requirements.
Key Milestones
The schedule below governs this solicitation. Please review the dates before requesting the RFP package — attendance at the mandatory site visit is required.
Scope Snapshot
This solicitation is for the ERCES Integrator only. Non-RF trades (conduit, power, fire alarm programming, roofing, finishes) are by others per the Responsibility Matrix in the RFP. The full RFP package controls — this page is a summary.
Included Work
- BDA / master equipment, fiber remotes, BBUs, annunciator, AMS
- Donor antenna, all indoor antennas, passives, jumpers, connectors, grounding kits
- ERCES fiber patch panels, termination hardware, splicing, testing, labeling
- Equipment startup, donor alignment, RF balancing, commissioning
- Cable sweep / FDR testing, fiber testing, pretesting
- Closeout documents, as-builts, O&M manuals, owner training, warranty
- ERCES / DAS permit application, AHJ responses, resubmittals, inspection coordination
Excluded (By Others)
- Conduit, pull boxes, back boxes, sleeves, pull strings
- Dedicated power circuits, disconnects, electrical rough-in
- ANN-to-FACU interface and 2-hour CI cable between ANN and BDA/BBU
- Fire alarm programming, monitor modules, FACU work, FA permit
- Roofing warranty work, flashing, waterproofing by roofing trade
- Access panels, architectural patching, finish restoration
Request the RFP Package
Qualified ERCES integrators are invited to request a copy of the full RFP and design package. Submissions are routed to info@hetnet.com and the HetNet team will follow up directly with the package and any next steps.